A closed Caldrion transaction. The property, the seller and our partners are not named. Figures are as underwritten at closing; yield on cost, IRR and multiple are targets, not realized results.
At a glance
| Buildings | 4 |
| Size | 186,000 sq ft, 18–24 ft clear |
| Price | $26.0M ($140 per sq ft) |
| Leased at closing | 58% |
| Structure | Joint venture, 90/10 |
The asset
Four multi-tenant buildings built 1981–85, close to downtown and I-70. Estimated replacement cost is about $230 per sq ft.
The situation
A 2019 buyer defaulted during lease-up and the bank took title. The bank wanted a buyer with no financing contingency who could close that quarter.
Why it fit
The price was about 40% below replacement cost in a land-constrained infill location. The vacancy came from oversized, poorly configured bays, not from the location.
Business plan
- Re-demise the vacant bays into 6,000–12,000 sq ft suites, and add 8 dock positions and 6 drive-in doors.
- Upgrade electrical service, replace two roofs, retrofit lighting to LED, and repaint and repave the truck courts.
- Lease to 94% at about $14.00 NNN, with the local operating partner leading leasing.
Capital structure
$32.5M total, including $5.5M of capital spending with $1.6M of TI/LC. Closed all-cash, then placed a $16.25M bank loan with future funding at month 3, leaving $16.25M of equity (Caldrion $14.6M, operating partner $1.6M).
Underwriting at closing
- 3.5% going-in cap rate
- 7.35% stabilized yield on cost
- 16.0% target net IRR
- 2.0x equity multiple
- Five-year hold
Key risk
The pace of lease-up. Underwriting assumes 30 months to stabilize, with carrying costs funded at closing.
See all our transactions, what we pass on and our criteria.
This case study is provided for information only. It is not an offer of securities or investment advice, and past or targeted results do not indicate future results.